Apartment Redevelopment Design — When You Need One, What It Includes and How Much It Costs

4 min read ·

Moving a wall, combining the kitchen with the living room, enlarging the bathroom at the expense of the hallway — these are common wishes during a renovation. Some of these changes require a design and approval, and ignoring that is risky: an unauthorised redevelopment comes to light when you sell, take out a mortgage or after a neighbour complains.

Redevelopment and re-equipment — what's the difference

  • Redevelopment (pereplanirovka) — changing the configuration of the space: moving and removing partitions, making openings, combining rooms.
  • Re-equipment (pereustroystvo) — moving or replacing building services equipment: plumbing, a gas cooker, radiators, ventilation.

A renovation often involves both, and they are approved together.

What you must never do under any circumstances

  • Remove or weaken load-bearing walls and columns without calculations and a permit.
  • Move "wet" areas — the bathroom, toilet — above the living rooms of the neighbours below.
  • Combine a kitchen that has a gas cooker with a living room without a door or partition — the requirements for gas-supplied rooms are strict.
  • Join a balcony or loggia to a room and move the radiators onto the balcony.
  • Touch ventilation shafts and the building's common risers.

The specific rules depend on the country and region, so the final answer will come from a designer who knows the local requirements.

What a redevelopment design includes

  1. Measured plan — the apartment as it is, from measurements or from the technical passport.
  2. Demolition plan — what is being removed.
  3. Construction plan — new partitions and openings, their materials and dimensions.
  4. Post-redevelopment plan with a room schedule and areas.
  5. Explanatory note: what is changing and why it doesn't reduce the building's load-bearing capacity or worsen conditions for the neighbours.
  6. Technical report on the condition of the structures — if load-bearing elements are affected.
  7. Re-equipment — plumbing, ventilation and electrical layouts, if they change.

A redevelopment design and an interior design project are not the same thing

An interior design project answers the question "what will it look like and where does the furniture go". A redevelopment design answers "what can legally be changed in the structure and how to get it on paper". A good designer takes redevelopment constraints into account, but the approval document is a separate job done by a building designer. The difference is explained in detail in the article interior design project and working documentation.

How much it costs

The price depends on the floor area, the extent of the changes and whether a technical report on the load-bearing structures is needed. As a guide, it's comparable to the space-planning stage of an interior design project: for a 60 m² apartment in Russia that is 18 000 – 42 000 ₽. If load-bearing walls are affected, a structural engineer's work and a survey are added.

Approval by the housing inspectorate or the administration is a separate process with its own timelines. Some specialists take it on for an extra fee; clarify this in advance and record it in the order.

What to do

  1. Before the renovation, order measurements and a space plan.
  2. Show the layout to a building designer: they will tell you what needs approval.
  3. If approval is needed, order a redevelopment design and submit the documents.
  4. Start work after approval, not before.
  5. After the renovation, register the changes in the technical passport or the EGRN (Russia's unified state property register).

Where to find a specialist

Designers who handle redevelopments are in the architectural design section, for example in Russia. For the design of your future interior, see the interior design section. The work can be split into stages, with each one paid for through a secure deal.

This article is not legal advice. The approval procedure differs by country and region — check it with your designer or the local housing inspectorate.

Read also

Architectural design · Uzbekistan

How Much a Private House Design Costs in Tashkent

House design prices in Tashkent and Uzbekistan — concept, architectural section, structures and the full design. A worked example for a 150 m² house, with timelines.

2 min · October 25, 2026
Architectural design

How to Check an Architect Before Ordering a Design — an 8-Point Checklist

What to look at so you don't pick the wrong architect or designer: portfolio, completed buildings, building codes, scope of the design, the contract and staged payment.

2 min · October 25, 2026
Architectural design

Concept Design, Stage P and Working Documentation — What's the Difference

The stages of an architectural design in plain words — concept design, design documentation (stage P) and working documentation (stage R). What a private client needs, and what is needed for approvals.

2 min · October 25, 2026

The site uses essential cookies to work. Yandex Metrica (visit statistics and recording of actions on pages) is switched on only if you press «Accept all» or allow it in the settings. Details are in the Cookie Policy.